What is the most effective approach for integrating new international resources into an existing Resource Breakdown Structure (RBS)?
a.
Add a geographical dimension to the RBS while maintaining the existing functional categories
b.
Implement a parallel RBS system that focuses on time zone distribution and cultural competencies
c.
Establish independent resource pools based on regional availability and cross-reference with local skill sets
d.
Create separate RBS structures for each international location and link them through a master schedule