Limit Work in Progress (WIP)

5 minutes 5 Questions

Limiting Work in Progress (WIP) is a core Kanban practice that involves setting a cap on the number of work items that are in progress at any given time. The main objective of WIP limits is to prevent overloading the team, reduce multitasking, and enhance productivity by ensuring that team members focus on completing tasks rather than starting new ones. By imposing WIP limits, teams can minimize context switching, which often leads to decreased efficiency and increased errors. It encourages a flow-based approach where the emphasis is on moving work items through the entire process to completion before taking on new tasks. This practice helps in maintaining a steady flow of work and reduces the lead time for individual work items. Implementing WIP limits also aids in identifying bottlenecks within the workflow. When a particular stage reaches its WIP limit, it signals that the team needs to address any issues causing the slowdown before adding more work. This proactive approach enables teams to address problems promptly, leading to continual process improvement. In a practical sense, WIP limits are indicated on the Kanban board, usually at the top of each column representing a stage in the workflow. Team members are required to adhere to these limits, fostering discipline and a culture of completion. It also promotes collaboration as team members may assist each other to clear bottlenecks to allow new work to enter the system. For a Disciplined Agile Scrum Master, managing WIP is essential to balance demand against throughput and to ensure sustainable pace within the team. It aligns with agile principles of delivering value early and often by completing work items efficiently. Overall, limiting WIP enhances focus, quality, and predictability in the delivery process.

Limit Work in Progress (WIP): A Comprehensive Guide

Introduction to Limit Work in Progress (WIP)

Limiting Work in Progress (WIP) is a fundamental practice in Kanban methodology that focuses on managing the amount of work items being processed simultaneously. This guide explores what WIP limits are, why they matter, how to implement them, and how to answer exam questions on this topic.

What is Limit Work in Progress?

Limiting WIP refers to establishing a maximum number of work items allowed in various stages of a workflow at any given time. These limits are typically visualized on a Kanban board, where each column represents a workflow stage and contains a maximum number of tasks allowed.

For example, a development team might set their WIP limits as:
- Analysis column: 3 items maximum
- Development column: 5 items maximum
- Testing column: 4 items maximum

Why Limiting WIP is Important

1. Reduces context switching: When team members juggle too many tasks, they lose productivity when switching between them.

2. Improves flow efficiency: By focusing on completing work rather than starting new work, teams can deliver value faster.

3. Exposes bottlenecks: When WIP limits are reached, it becomes obvious where workflow problems exist.

4. Enhances quality: With fewer tasks in progress, teams can focus more attention on each item, reducing defects.

5. Decreases lead time: The time from task initiation to completion shortens as teams finish current work before starting new work.

How WIP Limits Work in Practice

1. Setting appropriate limits: WIP limits should be set slightly below team capacity, typically starting with the formula: Number of people × 1.5.

2. Visualizing limits: Display WIP limits clearly on each column of your Kanban board.

3. Respecting limits: When a column reaches its WIP limit, the team must focus on moving items forward before pulling in new work.

4. Adjusting limits: Periodically review and refine WIP limits based on team capacity and workflow needs.

Implementing WIP Limits

1. Start with current state: Begin by observing how many items are typically in progress.

2. Introduce slightly lower limits: Set initial WIP limits somewhat below current levels to create gentle pressure toward improvement.

3. Gain team buy-in: Ensure the team understands the purpose and benefits of WIP limits.

4. Monitor and adjust: Regularly review how WIP limits are affecting flow and team performance.

5. Address violations: When WIP limits are exceeded, treat it as a learning opportunity and system problem, not individual failure.

Exam Tips: Answering Questions on Limit Work in Progress (WIP)

1. Focus on flow, not resource utilization: Remember that Kanban prioritizes optimizing flow over keeping everyone busy.

2. Emphasize system thinking: Highlight how WIP limits improve the entire system rather than individual productivity.

3. Connect to Lean principles: Link WIP limits to reducing waste, especially waiting time and partially done work.

4. Distinguish from Scrum: Unlike Scrum's time-boxed iterations, Kanban uses WIP limits to control flow continuously.

5. Cite metrics: Mention how WIP limits affect key metrics like lead time, cycle time, and throughput.

Sample Exam Question Types

1. Scenario-based questions: "A team has a testing column that frequently becomes a bottleneck. What would changing the WIP limit for this column accomplish?"
2. Calculation questions: "If a team has 6 members, what might be a reasonable starting WIP limit for their development column?"
3. Comparison questions: "How does limiting WIP in Kanban differ from capacity planning in Scrum?"
4. Effect questions: "What is the primary effect of lowering WIP limits on lead time?"
Key Concepts to Remember for Exams

- Little's Law: Lead Time = WIP ÷ Throughput (reducing WIP reduces lead time when throughput is constant)

- WIP limits should be per workflow state, not per person

- The goal is to optimize the whole system, not local efficiency

- WIP limits create a pull system rather than a push system

- Exceeding WIP limits indicates a system problem that needs addressing

Conclusion

Limiting Work in Progress is a core Kanban practice that enhances flow, reduces lead time, and improves quality by focusing team effort. By understanding both the theoretical foundations and practical applications of WIP limits, you'll be well-prepared to implement this practice effectively and answer exam questions with confidence.

Test mode:
Go Premium

Disciplined Agile Scrum Master Preparation Package (2025)

  • 2040 Superior-grade Disciplined Agile Scrum Master practice questions.
  • Accelerated Mastery: Deep dive into critical topics to fast-track your mastery.
  • Unlock Effortless DASM preparation: 5 full exams.
  • 100% Satisfaction Guaranteed: Full refund with no questions if unsatisfied.
  • Bonus: If you upgrade now you get upgraded access to all courses
  • Risk-Free Decision: Start with a 7-day free trial - get premium features at no cost!
More Limit Work in Progress (WIP) questions
7 questions (total)