Parametric Estimating

5 minutes 5 Questions

Parametric estimating is a quantitative technique used in project management to estimate the duration or cost of an activity based on statistical relationships between historical data and other variables. It involves using algorithms, formulas, or cost models to calculate estimates, often relying on rates or per-unit costs. This method is grounded in the principle that certain parameters, such as cost per square foot or hours per unit produced, can predict the duration or cost of activities when multiplied by the quantity involved. Parametric estimating can be applied at both the project and activity levels. For example, if it historically takes a certain number of hours to install one unit of equipment, and a project requires installing 50 units, the total installation time can be estimated by multiplying the two. This technique is particularly effective when historical data is accurate, relevant, and when the relationship between variables is well-established. One of the key advantages of parametric estimating is its ability to produce high levels of accuracy, especially when the parameters are reliable and the mathematical models are sound. It allows for scalability and can be adjusted for different sizes or complexities of projects. Additionally, it can save time compared to more detailed estimation methods, as it relies on readily available data and calculations. However, the accuracy of parametric estimates depends heavily on the validity of the underlying data and assumptions. Inaccurate data, changes in technology, or shifts in market conditions can lead to incorrect estimates. It's essential that the statistical relationships used in the models are current and reflective of the project's context. Parametric estimating is best used when there is enough historical data to establish meaningful relationships and when activities are quantifiable in standard units. It's often used in conjunction with other estimating methods to cross-validate results and improve overall estimate reliability. In conclusion, parametric estimating is a powerful tool for estimating activity durations by applying statistical relationships to historical data. It offers a balance between accuracy and efficiency, making it valuable for project managers aiming to develop reliable estimates based on quantifiable parameters.

Test mode:
Go Premium

PMI Scheduling Professional Preparation Package (2024)

  • 3429 Superior-grade PMI Scheduling Professional practice questions.
  • Accelerated Mastery: Deep dive into critical topics to fast-track your mastery.
  • Unlock Effortless PMI-SP preparation: 5 full exams.
  • 100% Satisfaction Guaranteed: Full refund with no questions if unsatisfied.
  • Bonus: If you upgrade now you get upgraded access to all courses
  • Risk-Free Decision: Start with a 7-day free trial - get premium features at no cost!
More Parametric Estimating questions
51 questions (total)