Short-Term vs Long-Term Capability
In Lean Six Sigma's Measure Phase, understanding Short-Term vs Long-Term Capability is crucial for accurate process assessment and improvement strategy development. Short-Term Capability refers to the process performance over a brief period, typically a few hours to a few days. It measures how wel… In Lean Six Sigma's Measure Phase, understanding Short-Term vs Long-Term Capability is crucial for accurate process assessment and improvement strategy development. Short-Term Capability refers to the process performance over a brief period, typically a few hours to a few days. It measures how well a process performs under consistent, controlled conditions with minimal variation from external factors. Short-term capability indices (Pp and Ppk) assume the process is stable and operating at its best. This metric reflects the inherent variation of the process itself, excluding special causes of variation. Short-term capability is often higher than long-term because it doesn't account for shifts, drifts, or environmental changes that naturally occur over extended periods. Long-Term Capability measures process performance over an extended timeframe, typically weeks, months, or longer. It accounts for all sources of variation, including special causes such as equipment degradation, material batch changes, operator differences, and environmental fluctuations. Long-term capability indices (Cp and Cpk) are more realistic representations of what customers actually experience. This metric is generally lower than short-term capability because it captures the cumulative effects of process drift and inconsistency. The relationship between these metrics is critical: the gap between short-term and long-term capability reveals process instability. A significant difference indicates that special causes of variation are affecting performance over time. For Black Belt practitioners, this distinction is essential because: 1. Short-term capability helps identify the process's true potential when optimally controlled 2. Long-term capability reflects real-world customer experience 3. The difference guides improvement priorities—focus on stabilizing processes showing large gaps 4. Both metrics are needed to establish realistic control limits and improvement targets 5. Industry standard assumes 1.5-sigma shift, explaining why Cpk targets differ from Ppk Understanding this relationship enables Black Belts to develop targeted improvement strategies addressing root causes of long-term variation while maintaining short-term excellence.
Short-Term vs Long-Term Capability in Six Sigma Black Belt - Measure Phase
Short-Term vs Long-Term Capability
Understanding the Fundamentals
In Six Sigma and process improvement, capability analysis is essential for determining whether a process can meet customer specifications. However, capability measurements must account for two different timeframes: short-term and long-term. Understanding the distinction between these two is critical for Black Belt certification and practical process improvement work.
Why Short-Term vs Long-Term Capability Matters
The importance of distinguishing between short-term and long-term capability cannot be overstated:
- Realistic Process Assessment: Short-term capability shows what your process can achieve under ideal, controlled conditions, while long-term capability reflects real-world performance over extended periods.
- Strategic Planning: Knowing long-term capability helps organizations set realistic improvement targets and allocate resources appropriately.
- Customer Satisfaction: Long-term capability directly impacts customer satisfaction since it represents actual sustained performance.
- Continuous Improvement: Understanding the gap between short-term and long-term helps identify root causes of performance degradation.
- Financial Decisions: Investment decisions for process improvement, equipment upgrades, or training programs depend on accurate capability assessments.
- Certification Requirements: Black Belt candidates must demonstrate deep understanding of these concepts for exam success.
What is Short-Term Capability?
Short-term capability measures a process's ability to meet specifications over a brief period, typically representing 20-25 consecutive observations or a single production run. Key characteristics include:
- Timeframe: Usually measured over hours or a single shift, not days or weeks.
- Conditions: Represents best-case scenario with minimal variation from assignable causes.
- Variation Source: Includes only common cause variation (inherent process variation).
- Stability Assumption: Assumes the process is in statistical control during measurement.
- Metric: Often expressed as Pp (Process Performance) and Ppk (Process Performance Index).
Short-term capability answers the question: What is the best our process can do under controlled conditions right now?
What is Long-Term Capability?
Long-term capability measures a process's sustained ability to meet specifications over an extended period, typically representing 100+ observations collected over weeks, months, or longer. Key characteristics include:
- Timeframe: Measured over days, weeks, months, or even years of production.
- Conditions: Reflects actual operating conditions with normal business variations.
- Variation Source: Includes both common cause variation and special cause variation (assignable causes like equipment drift, operator changes, material lot variations).
- Stability Assumption: Does not require the process to be in statistical control; captures real-world instability.
- Metric: Often expressed as Cp (Capability Index) and Cpk (Capability Index).
Long-term capability answers the question: What can we realistically expect from our process over time in actual operations?
Key Differences Between Short-Term and Long-Term Capability
| Aspect | Short-Term Capability | Long-Term Capability |
|---|---|---|
| Timeframe | Hours to single shift (20-25 observations) | Weeks to months (100+ observations) |
| Data Collection | Consecutive, controlled sampling | Random, mixed sampling over extended period |
| Variation Type | Common cause variation only | Common cause + special cause variation |
| Metric Used | Pp, Ppk | Cp, Cpk |
| Standard Deviation | Short-term sigma (σst) | Long-term sigma (σlt) |
| Process Stability | Assumes statistical control | Reflects actual instability |
| Real-World Application | What the process CAN do | What the process WILL do |
| Example Value | Ppk = 1.67 | Cpk = 1.33 |
How Capability Indices Work
Short-Term Capability Indices (Pp and Ppk)
Pp (Process Performance Index):
Pp = (USL - LSL) / (6 × σst)
- Measures the width of the process spread relative to specification width.
- Does not account for process centering.
- Lower value indicates less capable process.
Ppk (Process Performance Index - adjusted for centering):
Ppk = min[(USL - Mean) / (3 × σst), (Mean - LSL) / (3 × σst)]
- Accounts for both spread AND centering of the process.
- More useful than Pp because it reflects actual process performance.
- Most commonly reported metric for short-term capability.
Long-Term Capability Indices (Cp and Cpk)
Cp (Capability Index):
Cp = (USL - LSL) / (6 × σlt)
- Similar to Pp but uses long-term standard deviation.
- Assumes process is centered.
- Rarely the primary metric of interest.
Cpk (Capability Index - adjusted for centering):
Cpk = min[(USL - Mean) / (3 × σlt), (Mean - LSL) / (3 × σlt)]
- Standard metric for assessing long-term process capability.
- Accounts for both spread and centering over time.
- Most commonly used in capability studies and Six Sigma projects.
How These Metrics Work in Practice
Standard Deviation Calculation Differences
Short-term standard deviation (σst): Calculated from subgroups (ranges or standard deviations within rational subgroups) using control chart methods. This eliminates between-subgroup variation and captures only within-subgroup variation.
Long-term standard deviation (σlt): Calculated as the overall standard deviation of all individual observations, including all variation sources. This is a larger number than short-term sigma.
The Relationship Between Short-Term and Long-Term Capability
In a well-controlled process: σlt ≈ σst, meaning short-term and long-term capability are similar.
In a poorly controlled process: σlt > σst, meaning long-term capability is worse than short-term capability.
The ratio between long-term and short-term sigma reveals how much the process performance degrades over time due to special causes and process drift.
Practical Example
Scenario: Manufacturing widget diameter with specification 10mm ± 0.2mm (USL = 10.2, LSL = 9.8)
Short-Term Study (24 consecutive parts):
- Mean = 10.00mm
- Short-term sigma (σst) = 0.032mm
- Ppk = min[(10.2 - 10.0)/(3 × 0.032), (10.0 - 9.8)/(3 × 0.032)] = min[2.08, 2.08] = 2.08
- Interpretation: Excellent short-term capability - process can perform very well under controlled conditions
Long-Term Study (500 parts over 4 weeks):
- Mean = 9.98mm
- Long-term sigma (σlt) = 0.052mm
- Cpk = min[(10.2 - 9.98)/(3 × 0.052), (9.98 - 9.8)/(3 × 0.052)] = min[1.41, 1.15] = 1.15
- Interpretation: Adequate long-term capability, but significantly worse than short-term. Process deteriorates over time due to tool wear, temperature drift, or material variation
Gap Analysis: The drop from Ppk 2.08 to Cpk 1.15 indicates assignable causes degrading performance over time. Investigation might reveal tool wear requiring more frequent tool changes or temperature control issues in manufacturing equipment.
Interpretation Guidelines
Capability Index Values and Meaning:
| Cpk/Ppk Value | Interpretation | Action Required |
|---|---|---|
| < 1.0 | Process is not capable; produces defects regularly | Immediate corrective action required |
| 1.0 - 1.33 | Marginally capable; produces occasional defects | Tighten control; plan improvements |
| 1.33 - 1.67 | Adequately capable; minimal defects | Monitor; continuous improvement |
| > 1.67 | Very capable; essentially no defects | Maintain process; optimize costs |
| > 2.0 | Exceptionally capable; Six Sigma level performance | Leverage as best practice |
Why the Gap Between Short-Term and Long-Term Exists
Several factors cause long-term capability to be worse than short-term:
- Equipment Deterioration: Tool wear, bearing degradation, and mechanical drift occur over time.
- Environmental Variation: Temperature, humidity, and facility conditions fluctuate during extended periods.
- Material Lot Changes: Different suppliers or batches of raw materials introduce variation.
- Operator Changes: Different shifts, operators, and skill levels affect process execution.
- Process Drift: Gradual shifts in process mean occur without immediate detection.
- Setup Variation: Different changeovers between production runs introduce variation.
- Undetected Special Causes: Assignable causes that aren't visible in short-term windows accumulate.
How to Calculate Short-Term vs Long-Term Capability
Step-by-Step Process
For Short-Term Capability (Ppk):
- Collect 20-25 consecutive samples from a single time period (typically one shift).
- Ensure the process is in statistical control during this period.
- Calculate the mean of all observations.
- Calculate short-term standard deviation using:
σst = (Average Range) / d₂
where d₂ is a constant based on subgroup size (for n=5, d₂=2.326). - Identify upper specification limit (USL) and lower specification limit (LSL).
- Apply formula: Ppk = min[(USL - Mean)/(3σst), (Mean - LSL)/(3σst)].
- Report results with at least 2 decimal places.
For Long-Term Capability (Cpk):
- Collect 100+ observations over an extended period (weeks to months).
- Do NOT require the process to be in statistical control.
- Calculate the mean of all observations.
- Calculate long-term standard deviation using: σlt = √[Σ(xi - mean)² / (n-1)]
- Identify USL and LSL (same as short-term).
- Apply formula: Cpk = min[(USL - Mean)/(3σlt), (Mean - LSL)/(3σlt)].
- Report results with at least 2 decimal places.
- Compare Cpk to Ppk to assess process stability.
Exam Tips: Answering Questions on Short-Term vs Long-Term Capability
Question Type 1: Conceptual Definitions
Common Question: "What is the primary difference between short-term and long-term process capability?"
Winning Answer Strategy:
- Start with timeframe: "Short-term capability measures performance over a brief, controlled period (typically one shift or 20-25 observations), while long-term capability measures sustained performance over extended operations (weeks/months with 100+ observations)."
- Discuss variation sources: "Short-term includes only common cause variation, whereas long-term includes both common cause and special cause variation."
- Explain practical impact: "Short-term shows what a process CAN do under ideal conditions; long-term shows what it WILL do in actual operations."
- Mention metrics: "Short-term uses Ppk; long-term uses Cpk."
Exam Tip: Don't just define the terms—explain why the distinction matters for process improvement and decision-making.
Question Type 2: Metric Selection
Common Question: "You have conducted a process capability study. Your Ppk is 1.85 but your Cpk is 1.22. What does this tell you?"
Winning Answer Strategy:
- Acknowledge the gap: "The significant difference between Ppk (1.85) and Cpk (1.22) indicates the process performs well in the short-term but deteriorates over longer periods."
- Identify the problem: "This gap suggests special causes or assignable causes are degrading process performance over time."
- Recommend investigation: "We should investigate potential causes such as equipment drift, tool wear, material variation, temperature fluctuations, or operator differences."
- Address the practical concern: "Although short-term capability appears good (1.85), the actual sustained capability (1.22) is only marginally acceptable and requires improvement."
- Suggest actions: "Prioritize process improvements targeting long-term stability, such as more frequent preventive maintenance, tighter material controls, or improved temperature management."
Exam Tip: Always calculate and compare the ratio between Ppk and Cpk. A ratio > 1.2 suggests significant special cause variation that needs investigation.
Question Type 3: Calculation Problems
Common Question: "A specification is 100 ± 10 (LSL=90, USL=110). A short-term study shows a mean of 100.2 and sigma of 2.5. Calculate Ppk. What improvement is needed to achieve Ppk of 1.67?"
Winning Answer Strategy:
- Calculate current Ppk:
Ppk = min[(110 - 100.2)/(3 × 2.5), (100.2 - 90)/(3 × 2.5)]
= min[9.8/7.5, 10.2/7.5]
= min[1.307, 1.360]
= 1.307 - Interpret current state: "Current Ppk of 1.307 indicates marginally capable process with occasional defects."
- Calculate required sigma for target Ppk: "To achieve Ppk = 1.67, we need to reduce sigma. Using the limiting factor (9.8):
1.67 = 9.8 / (3 × σrequired)
σrequired = 9.8 / (3 × 1.67) = 1.96" - Calculate improvement needed: "Current sigma = 2.5; required sigma = 1.96. This represents a 21.6% reduction in variation, or ratio of 1.276."
- Explain the path: "We must reduce process variation from 2.5 to 1.96, a reduction of 0.54 units. This might be achieved through tighter equipment maintenance, better operator training, material control improvements, or environmental controls."
Exam Tip: Always show your calculations step-by-step. Use min() function correctly—this is critical. Don't forget to convert Ppk improvement targets into sigma requirements.
Question Type 4: Scenario Analysis
Common Question: "Your company manufactures circuit boards. Short-term capability study shows Ppk = 1.88. However, customer complaints about defective boards have tripled over the past month. What might explain this discrepancy?"
Winning Answer Strategy:
- Identify the core issue: "The high short-term Ppk (1.88) contradicts customer complaints, suggesting the short-term study doesn't reflect actual field performance."
- Hypothesize causes: "This discrepancy typically indicates:
- Process is drifting or deteriorating over extended periods (special causes in long-term)
- Short-term study was conducted during ideal conditions not representative of normal operations
- Quality issues emerging from different production sources or conditions than studied
- Assembly or handling processes downstream (not included in original study) introducing defects" - Recommend actions: "We should:
- Conduct a long-term capability study (100+ observations over 4+ weeks)
- Compare Ppk to Cpk to assess stability
- Investigate equipment maintenance records during customer complaint period
- Review material lot changes and supplier quality
- Examine operator training and shift-to-shift consistency" - Interpret implications: "The likely scenario is that our Ppk (1.88) represents best-case performance, while actual Cpk is much lower (perhaps 1.0 or below), meaning the process is NOT truly capable in real-world operations."
Exam Tip: When there's a discrepancy between capability study results and field performance, always suggest long-term studies and investigation of special causes. This demonstrates understanding that short-term studies can be misleading.
Question Type 5: Multiple Choice Strategies
Common Multiple Choice Patterns:
Pattern A: "Which metric should be used to evaluate long-term process capability?"
Wrong answers: Pp, Ppk, Ppm
Correct answer: Cpk
Why: Only Cp/Cpk use long-term sigma based on extended observation periods.
Pattern B: "What is typically included in long-term capability but NOT in short-term capability?"
Wrong answers: Common cause variation, within-piece variation, specification width
Correct answer: Special cause variation (or assignable causes)
Why: This is the fundamental distinction between short and long-term.
Pattern C: "A process shows Ppk = 1.60 and Cpk = 0.95. What should be the primary focus of improvement?"
Wrong answers: Reduce process centering, increase specification width, collect more data
Correct answer: Investigate and eliminate special causes; improve process stability
Why: The gap indicates special cause variation that needs investigation and elimination.
Exam Tip: In multiple choice questions about capability indices, the test-maker often includes "trap" answers using wrong metrics. Always confirm you're matching the timeframe (short-term = Ppk, long-term = Cpk).
Question Type 6: Gap Analysis and Root Cause
Common Question: "Your Ppk is 2.14 and your Cpk is 0.88. You have enormous gap between short-term and long-term performance. Without conducting any data collection, what single root cause is MOST likely responsible?"
Winning Answer Strategy:
- Assess the magnitude: "A gap from 2.14 to 0.88 is severe and indicates major deterioration of process performance over time."
- Recognize the pattern: "When short-term is excellent but long-term is poor, it indicates something is changing or drifting in the process that isn't visible in the short-term window."
- Identify most likely single cause: "Given this is asking for a single cause: Equipment drift or tool wear is the most common culprit, because:
- It's often gradual and not immediately visible
- It affects production consistently over hours/days
- It explains why early production (short-term) is good but later production (long-term) degrades
- It's a special cause that becomes apparent only over extended operation" - Alternative answers: "Other likely causes include sustained temperature drift, material supplier change, or undetected process offset."
- Recommend verification: "This hypothesis should be verified by checking preventive maintenance records, tool change logs, and creating control charts to identify when the deterioration begins."
Exam Tip: When asked for the "most likely" single cause of large Ppk-Cpk gaps, think about what causes gradual deterioration visible only over extended timeframes: equipment drift, tool wear, or sustained environmental changes are typically the best answers.
Question Type 7: Real-World Application and Decision-Making
Common Question: "Should we release this product to production if Ppk = 1.45 and Cpk cannot be calculated because we don't have long-term data yet?"
Winning Answer Strategy:
- Address the immediate question: "Ppk of 1.45 indicates marginal short-term capability (1.33-1.67 range), which suggests the process CAN meet specifications currently."
- Flag the risk: "However, without Cpk data (long-term capability), we don't know if the process will sustain this performance. The process might be unstable."
- Provide a recommendation: "The safest approach is:
1. Release to production WITH enhanced monitoring
2. Immediately begin collecting long-term data
3. Establish control charts to detect special causes
4. Plan for a full capability reanalysis in 4-6 weeks" - Set conditions: "Release should be conditional on:
- 100% inspection or sampling plans during ramp-up
- Real-time SPC monitoring
- Commitment to gather Cpk data quickly
- Established stopping rules if Cpk is found to be inadequate" - Explain the business logic: "This approach balances speed-to-market against quality risk. We proceed cautiously while gathering the information needed to make a final decision."
Exam Tip: Questions about real-world decisions always reward answers that acknowledge uncertainty and propose risk mitigation strategies. Never give a simple yes/no; explain your reasoning and proposed safeguards.
Question Type 8: Sigma Level Conversion
Common Question: "Convert a Cpk of 1.67 to its equivalent sigma level."
Winning Answer Strategy:
- Recall the relationship: "In a centered process: Cpk = Sigma Level / 3. Therefore: Sigma Level = Cpk × 3"
- Calculate: "1.67 × 3 = 5.01 sigma, which rounds to approximately 5 sigma."
- Interpret: "A Cpk of 1.67 represents a 5-sigma level process, producing approximately 233 defects per million opportunities (DPMO) in the long term."
- Business context: "This is considered 'world class' capability by Six Sigma standards and represents excellent process performance."
Common sigma conversions to memorize:
- Cpk = 1.00 = 3 sigma
- Cpk = 1.33 = 4 sigma
- Cpk = 1.67 = 5 sigma
- Cpk = 2.00 = 6 sigma
Exam Tip: Memorize the Cpk-to-sigma conversion formula. It appears frequently in exams and demonstrates deep understanding of Six Sigma concepts.
Common Exam Mistakes to Avoid
- Confusing Pp with Cp or Ppk with Cpk: Short-term uses P (Performance); long-term uses C (Capability). Get this wrong and your answer is automatically marked incorrect.
- Using wrong standard deviation: Using overall standard deviation for Ppk (it should be short-term sigma) or vice versa will produce incorrect values.
- Ignoring process centering: Ppk and Cpk account for centering; Pp and Cp do not. Always use the adjusted indices (Ppk/Cpk) unless specifically asked otherwise.
- Not explaining the gap: When Ppk >> Cpk, always explain that special causes are degrading long-term performance. This demonstrates systems thinking.
- Treating short-term as sufficient: Never assume that good short-term capability means the process is truly capable. Long-term data is essential for real-world decisions.
- Miscalculating min(): The min() function selects the smaller of the two calculations. Double-check which side of the distribution is limiting.
- Forgetting specification limits: Capability without reference to USL/LSL is meaningless. Always identify and use the correct specification.
Key Takeaways for Exam Success
- Master the distinction: Short-term = current ideal performance; Long-term = sustained real-world performance.
- Remember the metrics: Ppk for short-term, Cpk for long-term. This distinction is tested repeatedly.
- Understand the gap: Large differences between Ppk and Cpk indicate special causes requiring investigation.
- Know the calculations: Be prepared to calculate both metrics and explain your results.
- Apply systems thinking: Always connect capability results to business implications and process improvement priorities.
- Practice scenario analysis: Be ready to interpret real-world situations where capability studies reveal process problems.
- Explain thoroughly: Short answers lose points. Always explain the "why" behind your conclusions.
🎓 Unlock Premium Access
Lean Six Sigma Black Belt + ALL Certifications
- 🎓 Access to ALL Certifications: Study for any certification on our platform with one subscription
- 6176 Superior-grade Lean Six Sigma Black Belt practice questions
- Unlimited practice tests across all certifications
- Detailed explanations for every question
- CSSBB: 5 full exams plus all other certification exams
- 100% Satisfaction Guaranteed: Full refund if unsatisfied
- Risk-Free: 7-day free trial with all premium features!