Construction Risk Management
The risk process on construction and built environment projects: positive risk, risk classifications, identification and allocation, prioritization during Front End Planning, and the risk tools (IPRA, Monte Carlo simulation, probabilistic techniques, risk registers) and the framework mobilized at the outset.
In the PMI Construction Professional (PMI-CP) certification, Construction Risk Management is a core competency. It covers how professionals in the built environment identify, analyze, respond to, and control uncertainties that could affect a project's safety, cost, schedule, quality, and stakeholde…
PMI-CP - Construction Risk Management Example Questions
Test your knowledge of Construction Risk Management
Question 1
During Front End Planning for a port terminal expansion, the prioritized register ranks three top threats: a delayed environmental permit from the authority, unforeseen contaminated dredge material, and steel price escalation. The sponsor wants all three moved to the design-build contractor through the contract to protect the owner's budget. Tender documents are being drafted now. What should the project manager do NEXT?
Question 2
On a construction management at risk project, the owner sets construction contingency at the expected monetary value of the risk register. The register's threats total $900,000 of expected value. A new opportunity has been logged: prefabricating the plant room would save $400,000, and there is a 50% probability that a fabrication slot is secured. The slot decision comes in eight weeks. How should the project manager set the contingency now?
Question 3
At mobilization of a design-build hospital wing, the project manager is planning the first risk identification workshop. The sponsor suggests limiting attendance to the owner's internal team so the risk register can be drafted faster. The design-build contract assigns design development and construction methods to the design-builder. Which approach BEST supports a sound risk management framework at this stage?